Installation: Step 4 of 10
Using a tape measure, mark the center location of each floor joist onto the grade line according to the plans and specification (for example: 16”, 19.2”, 24”, or 32” on-center), but before you layout other foundation items. Make sure you begin layout from the outside edge of the foundation wall.
     
  Installation: Step 3 Installation: Main Menu Installation: Step 5