| Installation: Step 3 of 10 | ||
|
||
| Using a highly visible chalk, snap a grade line on the inside panel of the forms where joist ends will meet the foundation wall. | ||
Installation:
Step 2 |
Installation: Main Menu | Installation: Step 4 ![]() |